CASE STUDY - FORTUNE 500 UTILITY

Knowing where the grid will actually break.

A Fortune 500 utility's forecast of storm outages, up to six days ahead. NEXUS built a solution in one week that beat the incumbent vendor forecast on accuracy at every horizon - so crews and equipment are staged where the grid will actually break.

The Task

Predict storm outage counts

Decision Enabled

Crew & equipment staging

Accuracy vs. Incumbent

0.86 vs. 0.82, built in a week

01 The Challenge

01 The Challenge

Crews staged before the storm, not after

A Fortune 500 utility has to decide where to stage repair crews and materials before a storm arrives. It already relies on an outage forecast from an established vendor, delivered four times a day, up to six days ahead, company-wide and for each of its 13 service centers. The question: could NEXUS match that full scope and improve on its accuracy, quickly?

02 The Approach

02 The Approach

One week, the full forecasting scope

NEXUS's pre-trained foundation model identified outage signals in the utility's data, then was tested head to head against the forecast the utility uses today.

Same scope

Outages and customers out, company-wide and for each of 13 service centers, four times a day, same day to six days ahead.

Same rules

Only data available before each forecast was issued, so the backtest matches live use.

Same scoring

Scored on the same hold-out period, at the same issue times and horizons as the incumbent vendor forecast.

03 The Result

03 The Result

More accurate at every horizon, built in a week

Measured Outcome

0.86 vs. 0.82

company-wide outage forecast accuracy, issued at 18Z for the next day, with a solution built in one week

Measured Outcomes

0.79 vs. 0.74

accuracy six days out, where NEXUS's lead is widest (averaged across issue times). NEXUS holds close to its same-day accuracy of 0.85 across the whole week, giving planners a more dependable forecast further ahead

One week from raw data to a forecast ahead of the incumbent, on the same days, issue times and metric. NEXUS followed the actual outage curve more closely, month after month from February to July.

Accuracy is 1 minus the average percentage error; higher is better.

04 The Impact

04 The Impact

One week to value, with five more to follow.

The pipeline runs end to end - weather download, point-in-time checks, NEXUS, scoring - and can deliver the same daily forecast file at the four issue times, alongside the current one. Each new use case swaps the target and keeps the rest: restoration time per outage, which circuits fail next, substation peak load, daily gas demand, equipment failure risk.